Skip to content

Construction and contractors

Notifiable work: giving WorkSafe 24 hours’ notice of hazardous work

Reviewed 18 November 2026 · Sources: WorkSafe New Zealand, New Zealand Legislation · 8 min read

Under regulation 26 of the Health and Safety in Employment Regulations 1995, which is still in force, you must give WorkSafe written notice, so far as is reasonably practicable, at least 24 hours before certain hazardous work starts. The regulations call this notifiable work and WorkSafe calls it particular hazardous work. It includes construction work where a person could fall 5 metres or more, erecting or dismantling scaffolding from that height, some excavations, commercial logging and tree felling, heavy lifts, explosives and work breathing compressed air.

Notice is given before the work, so WorkSafe can plan workplace visits. It is a different duty from notifying a notifiable event, which happens after something has gone wrong. This guide sets out the full list, the exclusions, how to notify and how the two duties compare.

Key points

  • Notifiable work notice comes from regulation 26 of the Health and Safety in Employment Regulations 1995, not from HSWA.
  • Give written notice at least 24 hours before the work begins, so far as is reasonably practicable.
  • WorkSafe takes notice of particular hazardous work through an online form.
  • Some construction height work is excluded, such as work on a residential building up to and including 2 full storeys, or work from a ladder only.
  • Licensed asbestos removal has its own notice: at least 5 days before work starts, under the Asbestos Regulations 2016.
  • Notifiable events (deaths, notifiable injuries or illnesses and notifiable incidents) are notified after they happen, under HSWA section 56.

What is notifiable work?

Notifiable work is a set of high-risk activities, defined in the Health and Safety in Employment Regulations 1995, that WorkSafe must be told about before they start. The 1995 Regulations predate the Health and Safety at Work Act 2015 (HSWA), and parts of them remain in force, including the notice duty in regulation 26.

WorkSafe says the purpose of the notice is to help it plan workplace visits that promote the prevention of harm to people at, or near, the place of work. Giving notice does not change your duties to manage the risks of the work.

What work needs 24 hours’ notice to WorkSafe?

WorkSafe lists the following as particular hazardous work:

Particular hazardous work (notifiable work), as WorkSafe lists it
WorkDetails and exclusions
Construction work with a risk of falling 5 metres or moreExcludes: work in connection with a residential building up to and including 2 full storeys; work on overhead telecommunications lines and overhead electric power lines; work carried out from a ladder only; maintenance and repair work of a minor or routine nature.
Erecting or dismantling scaffoldingWhere there is a risk of falling 5 metres or more.
Logging or tree fellingWhere it is undertaken for commercial purposes.
Lifting with a lifting applianceWhere the appliance has to lift a mass of 500 kilograms or more a vertical distance of 5 metres or more. Excludes work using an excavator, a forklift or a self-propelled mobile crane.
Work under ground coverWork in any drive, excavation or heading in which any person is required to work with a ground cover overhead.
Deep or steep excavationsWork in any excavation in which any face has a vertical height of more than 5 metres and an average slope steeper than 1 horizontal to 2 vertical.
Pits, shafts and trenchesWork in any pit, shaft, trench or other excavation in which any person is required to work in a space more than 1.5 metres deep and having a depth greater than the horizontal width at the top.
ExplosivesWork involving the use of explosives, or storage of explosives for use at the worksite.
Breathing compressed airConstruction diving work, and other work, in which a person breathes compressed air or a respiratory medium other than air.

Read the trench rule carefully: both tests must be met. A trench more than 1.5 metres deep is notifiable where its depth is also greater than its width at the top. A trench 1.8 metres deep and 2.5 metres wide at the top would not meet the second test, but you still have to manage the collapse risk.

The height thresholds here are notice thresholds only. They are not safe heights. For how to manage fall risks at any height, see our guide to working at height.

How much notice, and what about emergency work?

Regulation 26 requires written notice, so far as is reasonably practicable, at least 24 hours before the notifiable work begins. It is 24 hours, not 24 working hours. Work due to start at 7am on Monday needs notice by 7am on Sunday at the latest.

The regulations make an exception for some emergency work, such as work needed after an earthquake, flood or storm. If you rely on it, we suggest keeping a record of why the work could not wait.

Our suggestion for planned projects: give notice once the start date is fixed rather than leaving it to the last day, so a late change in the programme does not catch you out.

How to notify WorkSafe of hazardous work

WorkSafe takes notice of particular hazardous work through the notification form linked from its particular hazardous work page.

A practical process (our suggestion, not a legal requirement):

  1. At planning stage, check every task in the programme against the list above. Flag scaffolding, edge work, lifts, excavations and any explosives.
  2. Agree with the other PCBUs on site which business will give the notice. Record it in the site specific safety plan.
  3. Before starting the form, gather the site address, a description of the work, when it starts and how long it will run, and who is in charge on site.
  4. Submit the form at least 24 hours before the work starts, and keep a copy or the confirmation with the project records.
  5. Brief the crew that the work is notifiable and why. The notice does not replace task planning, a rescue plan or supervision.

Notifiable work and notifiable events: the difference

The names are similar, but the duties are different. One is a heads-up before high-risk work. The other is a report after a serious event.

Notifiable work compared with notifiable events
Notifiable workNotifiable event
LawHealth and Safety in Employment Regulations 1995, regulation 26Health and Safety at Work Act 2015, sections 23 to 25 and 56
WhenAt least 24 hours before the work startsAs soon as possible after the PCBU becomes aware of the event
What triggers itPlanned work on the list, such as scaffolding where a person could fall 5 metres or moreA work-related death, notifiable injury or illness, or notifiable incident
HowWorkSafe’s online form for particular hazardous workBy the fastest means possible. For a death, WorkSafe says phone 0800 030 040 immediately. Otherwise use Notify WorkSafe.
Linked dutiesYour duties to manage the risks of the work continue as normalPreserve the site and keep records for at least 5 years

Giving notice of notifiable work does not reduce your duty to notify an event. If a scaffold you notified collapses, that collapse may itself be a notifiable incident. See our full guide to notifiable events.

Asbestos removal notification

Licensed asbestos removal is notified under the Health and Safety at Work (Asbestos) Regulations 2016, not under regulation 26. WorkSafe’s interpretive guidelines say the licensed asbestos removalist must notify WorkSafe in writing at least 5 days before starting the removal work (regulation 34), including related work such as site set-up, enclosure erection or scaffold erection.

WorkSafe says removal may start immediately only after a sudden, unexpected event, or an unexpected breakdown of an essential service, and the removalist must then notify WorkSafe immediately. WorkSafe does not accept a lack of planning, resourcing or commercial pressure as reasons. For surveys, management plans and licensing, see our guide to asbestos management.

Frequently asked questions

What is notifiable work in NZ?

It is high-risk work that WorkSafe must be told about before it starts, under regulation 26 of the Health and Safety in Employment Regulations 1995. It includes construction work where a person could fall 5 metres or more, scaffolding from that height, some excavations, commercial logging and tree felling, heavy lifts, explosives and work breathing compressed air.

How much notice do I have to give WorkSafe?

At least 24 hours before the work begins, in writing, so far as is reasonably practicable. There is an exception for some emergency work, such as work needed after an earthquake, flood or storm.

Do I need to notify WorkSafe for scaffolding?

Yes, if a person could fall 5 metres or more from it. Erecting or dismantling scaffolding with a risk of falling 5 metres or more is particular hazardous work and needs at least 24 hours’ notice.

Do trenches need to be notified to WorkSafe?

Some do. Work in a pit, shaft, trench or other excavation is notifiable where a person has to work in a space more than 1.5 metres deep and the depth is greater than the horizontal width at the top. Deep excavations with a steep face over 5 metres high and work under ground cover are also on the list.

Is house building notifiable work?

Construction work in connection with a residential building up to and including 2 full storeys is excluded from the 5 metre fall category. Other items on the list can still apply on a house site, for example a notifiable excavation, or scaffolding from which a person could fall 5 metres or more.

Who has to notify WorkSafe of hazardous work?

WorkSafe says the regulations require employers as well as the person who controls a place of work to give notice. On a shared site, agree which business will submit the notice and confirm it has been done.

Is notifiable work the same as a notifiable event?

No. Notifiable work is notified before planned high-risk work starts. A notifiable event, such as a death, a notifiable injury or a notifiable incident, is notified as soon as possible after it happens, under HSWA section 56.

Sources

This guide is general information about New Zealand health and safety law and WorkSafe guidance, written for businesses. It is not legal advice, and it is not published or endorsed by WorkSafe New Zealand. Check the current legislation at legislation.govt.nz and take advice on your own situation.