This free contractor assessment checklist helps a New Zealand PCBU gather health and safety information from a contractor before the work starts, and agree in writing who will manage which risk. It does not hand over your duty: contractors and their workers are your workers under HSWA, so you still brief, induct and monitor them.

No registration, no email, no download gate.

How to use it

  1. Describe the job and its main risks, so you know how much information to ask for. A small low-risk job needs far less than high-risk work.
  2. Send the contractor the checks in Part 1 before you hire them, and ask for evidence where it matters.
  3. Review the answers and evidence. Follow up anything missing or unclear before you decide.
  4. Agree in writing, in Part 2, who will manage each shared risk, and write the requirements into the contract.
  5. Induct the contractor's workers on your site's hazards, rules and emergency procedures before they start.
  6. Monitor the work while it is under way and follow up anything unsafe.
  7. Review how the job went at the end, and keep the record for the next time you choose a contractor.

Contractor assessment checklist

Featherstone Safety Hub free template for New Zealand workplaces. General information, not legal advice.

Business (PCBU) engaging the contractor
Contractor's legal business name
Contractor's contact person and phone
Job and site
Planned start and finish
Checked by

Part 1: checks before the work starts

CheckYesNoN/ANotes or action needed
The contractor
The scope of work is written down and agreed
Any subcontractors they will use are named
Public liability insurance is current (note the expiry date)
A contact person is named for health and safety on this job
How they manage health and safety
A safe work method or task analysis for this job has been provided
The main risks of the job are identified, with the controls they will use
They have a way for their workers to report hazards, incidents and near misses
They have told you about recent notifiable events or WorkSafe notices, and what they changed
They describe how they engage their own workers on health and safety
Competence and equipment
Licences, registrations or certificates the work needs are sighted and current
Their workers are trained for the tasks, or will be supervised
Plant and equipment they bring is maintained, with checks recorded
Hazardous substances they will bring are listed, with safety data sheets
Working on our site
Site induction is booked for every worker before they start
Our hazards, site rules and emergency procedures have been shared
Permits needed for the work (such as hot work or confined spaces) are identified
How and when we will check in during the job is agreed

Part 2: who does what

Risk or activityThe contractor willWe willAgreed (initials)

Decision

Approved / approved with conditions / not approved
Conditions
Review after the job (how well the agreed plan was followed)

Sign-off

Decision made by (name and signature)
Date

What the law says

These points are taken from our guides, which list the legislation and WorkSafe pages they were checked against. A legal requirement, WorkSafe guidance and good practice are not the same thing, so they are kept apart.

The law requires

  • Contractors, subcontractors and their employees are all workers under HSWA (section 19), so the PCBU engaging them owes them the primary duty of care. See contractor management.
  • A contract term that tries to exclude, limit or transfer an HSWA duty has no effect to that extent (section 28). See contractor management.

WorkSafe guidance says

  • WorkSafe expects you to get health and safety information from a contractor before hiring. Formal pre-qualification is optional. See contractor management.
  • WorkSafe expects monitoring for the duration of the contract, including performance reviews, inspections and following up unsafe practices. See contractor management.

Good practice

  • Write health and safety requirements into the contract, then brief, induct and monitor. Pre-qualification alone does not meet your duty. See contractor management.

This template is general information for New Zealand workplaces, not legal advice. Adapt it to your own work and risks. It is not published, approved or endorsed by WorkSafe New Zealand, and using it does not by itself meet any duty.